The plywood starts to go down
The bedroom all packed up
The tile floor being ripped up in the living room
Computer under wraps
Concrete exposed
Shifted all those bookcases..
A stack of plywood to go down
And the bamboo floor begins to appear
Kitchen floor ripped up
10 days later, the floor has reached the library and the first main stack is moved
Living room full of books
A small path to the door
Alleyways in the stacks
Still operational under tarps
Pretty crowded